Alta Vista Drive Retrofit

Architecture

GreenArc2022-2A5215FF-cf-tsquare

Project Information

  • Total Lot Area = 202.91m2
  • Gross Floor Area = 202.63m2
  • Total Construction Area = 365.48m2
  • # of Storeys = 3
  • Original Turnover Date = Construction May 2012;
  • Retrofit Turnover Date = Sep 2014

Institutional-Religious

GreenArc2022-2A5215FF-cf-residence

Amenities

  • Entrance Canopy
  • Solar PV w/ support trellis
valenzuela_Valenzuela-pc-2014_web-300x225
valenzuela_20190415_171102_webv2-300x225
valenzuela_SAM_0179_web-300x225
valenzuela_SAM_0176_webv2-300x225

Sustainability

GreenArc2022-2A5215FF-cf-leaf

Strategies

  • Entrance Canopy was intended to provide shelter from rain
  • Additional Trellis was constructed and intended for mounting of Solar PV Panels
  • Solar PV Panels totalling 2kWp capacity w/ net metering
one-dot

Benefits

  • The additional entrance canopy provided shelter from the rain
  • The additional installation of solar pv with net metering further reduced electric bills since the energy produced by solar pv in excess of what is used is sold back to the grid